PPN001 Houghton – November 2018

A live and operational health centre in the north east which required the main LV distribution upgrading. We carried out preparation works during the week back of house in readiness for a full shutdown and change over during the weekend. The main section board including metering and sub circuits were replaced in full, tested, certified and operational by the Sunday afternoon allowing the NHS to operate the building as usual on the Monday morning meaning no patients had to change any appointments with the centre.